The existing potable water network has a problem with water leaks. The OOMAPAS plans to address their water loss problem with a new potable water transmission line to a new storage tank. The objective of the study is to perform a pipe alignment analysis, topography, soils, and environmental impact to develop a final design for a 12” potable water transmission water line.
| Total Project Cost | US 50,016 | ||||
|---|---|---|---|---|---|
| NADBank Funding | $10,016 | ||||
| Other Funding Partners |
CONAGUA Municipality of Altar |