The project consists of expanding the sanitary sewage system, the installation of electromechanical equipment at the existing South Lift Station, construction of a pressurized wastewater forcemain, and the construction of the third module for the Wastewater Treatment Plant, including the construction of the infiltration lagoons for final disposal of the effluent.
| Total Project Cost | US 15.2M | ||||
|---|---|---|---|---|---|
| NADBank Funding |
US 1.58M - NADBank Loan US 6.08M - NADBank Grant: BEIF |